SAAKSHYA/
Yamuna Green Corridorplantation
Jev
Cloudinary
CV
SAAKSHYA ATTRIBUTABLE INTEGRITY REPORTSLUG: 6tqcxq6nt7

Yamuna Green Corridor

Period: 2026-09-01 → 2026-09-30·Prepared from 6 photos across 3 sites·9/29/2026
Models: Drafter (Groq, prose only) · Fact Verifier (TypeSafe Jev calibrated)

Findings & Observations

A baseline photograph of Plot B was captured on 2026‑06‑20.¹
Receipt thumb
Plot B: baseline photo taken 2026-06-20.
Jev support 93%
By 2026‑09‑25 the site response was graded as “Partially established” with a 91 % probability.²
Receipt thumb
Plot B: Site Response grade on 2026-09-25 is "Partially established" (probability 91%).
Jev support 95%
Vegetation cover in Plot B increased from 33 % to 48 % between the baseline and 2026‑09‑25, and the aligned view changed by 1 % with good registration.³
Receipt thumb
Plot B: between baseline and 2026-09-25, measured vegetation cover changed from 33% to 48% and 1% of the aligned view changed (registration good).
Jev support 87%
Only one photograph was accepted during the reporting period, none of which were contributed by community witnesses, and no photos remain pending review.⁴
Receipt thumb
Plot B: 1 photos accepted in the period, 0 of them from community witnesses; 0 awaiting review.
Jev support 85%
The rise in vegetation cover and the “Partially established” rating point to modest ecological progress on Plot B.
Overclaim Withheld

Not supported by the cited facts (support 25%)

However, the evidence base is limited to a single accepted photograph and no community‑witness contributions, leaving verification of outcomes weak.
Overclaim Withheld

Not supported by the cited facts (support 45%)